MICI-BID-CH-2016-0102

Santiago-Valparaiso-Viña Toll Road Guarantee

Country: Chile

Reception date: May, 25 2016

Current Status: Closed

Requesters:

Asociación de Canalistas del Embalse Pitama (Pitama Reservoir Irrigation Right-holders Association)

Summary of the Request

The complainants allege that the due to the Bank´s failure to comply with the Environmental and Safeguards Compliance Policy (OP-703) in relation to a waste site by the Pitama Reservoir was constructed without the proper environmental protection measures required to ensure the proper operation of the reservoir and safety of the water contained in it.  As a result of this, the walls of the waste site collapsed, blocking the water flow and reducing the level of the reservoir to inoperative levels. According to the complainants this has affected 105 agricultural properties and their productive capacity that depended on the irrigation from that reservoir. 

Recent actions

On August 2, 2016, the MICI Director determined that the Request is not eligible because it does not meet one of the eligibility criteria set out in paragraph 22 of subsection (d) of the ICIM Policy. In particular by not having evidence of efforts by the applicants to address issues with Management prior to submitting the Request to MICI. After notifying the parties, the process was terminated.

 

Past actions

On June 30, 2016 the Bank's Management submitted their Response to the Request, and as per MICI's Policy; an Eligibility Process is being carried out to determine whether the Request is eligible or not.

On June 1st, 2016 the Requesters representative sent to MICI the required documents, following which the MICI registered the Request and notified the Parties.

As there was some information missing in relation to the representativeness, the MICI granted the Complainants a 10 business days extension to provide the information which ends on June 13th, 2016.

The Request was sent initially to the IDB Country Office Representative in Chile who transferred it to the MICI and on May 25th, 2016 finally direct contact was made with one of the lawyers that represent the Association.

Project Number:

CH0167


Project Name:

Santiago-Valparaiso-Vina Toll Road (Guarantee)


Sector:

OTHER


Project Type:

Guarantee


IDB Financing:

USD 0


Registration
Registered
Eligibility
Not eligible
Assessment
Consultation Process
Monitoring
Recommendation for a CR and ToRs
Investigation
CR Report
Monitoring

Registration

Consultation Phase (CP)

Compliance Review Phase (CRP)

Chronology and documents

Steps and milestones Date Remarks Documents
Registry

24610

Request Receipt

2016-05-25

Requests of a confidential nature are not published.

24613

Notice of Registration

2016-06-02

5 business days from the date of receipt of the Request or 15 business days when further information is required from the Requesters.
Elegibility

24614

Management Response

2016-06-30

21 business days from the date of notice of registration. The response will be published as an annex to the Eligibility Memorandum.

24615

Eligibility due date

2016-08-02

21 business days from the date of receipt of Management Response or 45 business days after the Suspension is granted.

24616

Eligibility Memorandum Public Disclosure

2016-08-22

As per the Access to Information Policy (OP-102) the disclosure of this document is done simultaneous to its distribution to the Board of Executive Directors.

24617

Closing date of MICI process

2016-08-22